Description
With a total length of 976 km, the rehabilitation of the project starts at Jingmen, Hubei and ends at Fengjing, Shanghai, passing five provinces or municipalities, namely, Hubei, Anhui, Zhejiang, Jiangsu and Shanghai. The designed transmission capacity is 3000MW. Two new converter stations have been built, with one at Jingmen and the other at Huxi.
The increased transmission capacity of hydro power from 3 Gorges and Sichuan to Shanghai promotes mutual compensation of hydro and thermal power between Central China Grid and East China Grid, thus alleviating the pressure on East China Grid and guaranteeing power supply for the economic and social development of Shanghai. Clean energy transmitted from 3 Gorges and Sichuan will be fully utilized, which means the resource advantage of Western China can be transformed into economic advantage.
For this project, we supplied converter valves and control system components.
Main Data
Execution period | Apr.2009-May.2011 |
Rated DC Voltage | ±500kV |
Rated DC Current | 3000A |
Rated Capacity | 3000MW |